Mahesha Karunathilake
The use of chemical fertilizers, high yielding varieties and agricultural practices have resulted in tremendous develop in the agricultural sector. There is no doubt that use of chemical fertilizers has increased food grain production, but the excessive use is now leading to a decrease in crop yield, imbalance of nutrients in the soil, and an adverse effect on the soil's physiochemical properties. Also the use of chemical fertilizer leads to ecological disturbances and environmental pollution.
However, chemical fertilizers are not only short supply but also very expensive. At this critical stage biofertilizers are an excellent alternative for chemical fertilizers. They are low cost, renewable, and pollution free. Biofertilizers are useful as a supplement for chemical fertilizers.
Basically, biofertilizers are carrier based preparations containing specific strains of microorganisms like bacteria, fungi, algae or their combinations. Biofertilizers are categorized in to two main groups.
1. Biological N2 fixing biofertilizers
-Consist of microorganisms which have ability to fix N2 either symbiotically or a symbiotically.
2. PO43- Solubilizing biofertilizers
- Consist of microorganisms which have ability to solubilize fixed insoluble phosphates of the soil.
The use of biofertilizers has following advantages. They are cheap and can help to reduce chemical fertilizer consumption. They provide biological nitrogen directly to the plants. They help in solubilization and mineralization of other plant nutrients like phosphates. They enhance plant growth due to release of hormones, vitamins, auxins and other growth promoting substances. They control and suppress soil borne diseases .They increase crop yield by 10% -20 %. They improve soil properties and maintain soil fertility.
The production of biofertilizers is totally based on efficient strain of microorganisms. To select the efficient strains, different procedures are used. These procedures have three main steps called as isolation, identification and maintenance of the strain.
Microorganisms are isolated from the places which they are naturally live. Then it’s necessary to identify the microbial strains with good qualities. Since isolation and identification of any strain tedious and time consuming job it’s important to maintain the strains without loosing their characters.
The production technology of biofertilizers must be done under aseptic conditions and using sterilized media and equipments.
There are some disadvantages of biofertilizers such as contaminations and mutations during the production process. Also the presence of overpowering antagonistic microorganisms in the soil suppresses the establishment of the biofertilizers. Also the application of pesticides limits the nitrogen fixation capacity of them.
At present the biofertilizer industry is in its developing phase. Still farmers do not want to take the risk of reducing the application dose of chemical fertilizers. So there is a need to promote the biofertilizers among farmers as pollution free, productive and economically sound product.
Assignments, seminar abstracts and research abstracts by B.Sc. and M.Sc. students of Department of Forestry and Environment Science, University of Sri Jayewardenepura, Sri Lanka.
Showing posts with label pollution and control. Show all posts
Showing posts with label pollution and control. Show all posts
Tuesday, July 03, 2007
Norochcholai coal power plant
Sahan Pradsad Jayasinghe
Sri Lanka is facing a big electricity crisis during last several years. Hydro power fulfills 37% of the electricity demand and balance 67% is fulfilled by fuel. Electricity has supplied for 60% of the houses in the country and 40% of the house holders electricity demand still exists. Yet, the electricity demand increases 10% annually.
Due to increment of the oil price of the world market Sri Lanka has been facing financial constraints. Due to all the possible hydro power sources have been utilized and using oil to produce thermal power is not cost effective, Sri Lanka should make steps towards cheep and high power generating method. Coal is the only alternative for this because wind mills and fire wood like modes give lesser amount of energy comparing with coal.
The construction of coal power plant is commenced on 11th May 2006 with the purpose of fulfilling the increasing electricity demand of the country and providing electricity at cheaper cost. Project site is located at the Narakkalliya village in the Kalpitiya peninsula, about 12km from the Palavi junction.
It will be constructed in three stages, with a capacity of 300MW per plant per year, making a total capacity of 900MW by 2010.Project is funded by EXIM bank of china and total project cost is $455 million. Power plant only burns high quality low sulphur containing coal and they will be imported from South Africa, Australia and Indonesia.
Before the commencement of the project there were several susceptible socio-economic and environmental problems. According to the EIA assessment there will not be any harm for the environment and proper relocating families process before the beginning of the construction will solve socio economic problems. Some of the major environmental issues would be happen due to emissions like CO2, CO, SO2 and NOX, particles like fly ash, bottom ash and coal dust and cooling water discharge. Losing peoples’ houses and their agricultural lands would be the major socio-economic issues. All these issues will be solved or minimized.
Sri Lanka is facing a big electricity crisis during last several years. Hydro power fulfills 37% of the electricity demand and balance 67% is fulfilled by fuel. Electricity has supplied for 60% of the houses in the country and 40% of the house holders electricity demand still exists. Yet, the electricity demand increases 10% annually.
Due to increment of the oil price of the world market Sri Lanka has been facing financial constraints. Due to all the possible hydro power sources have been utilized and using oil to produce thermal power is not cost effective, Sri Lanka should make steps towards cheep and high power generating method. Coal is the only alternative for this because wind mills and fire wood like modes give lesser amount of energy comparing with coal.
The construction of coal power plant is commenced on 11th May 2006 with the purpose of fulfilling the increasing electricity demand of the country and providing electricity at cheaper cost. Project site is located at the Narakkalliya village in the Kalpitiya peninsula, about 12km from the Palavi junction.
It will be constructed in three stages, with a capacity of 300MW per plant per year, making a total capacity of 900MW by 2010.Project is funded by EXIM bank of china and total project cost is $455 million. Power plant only burns high quality low sulphur containing coal and they will be imported from South Africa, Australia and Indonesia.
Before the commencement of the project there were several susceptible socio-economic and environmental problems. According to the EIA assessment there will not be any harm for the environment and proper relocating families process before the beginning of the construction will solve socio economic problems. Some of the major environmental issues would be happen due to emissions like CO2, CO, SO2 and NOX, particles like fly ash, bottom ash and coal dust and cooling water discharge. Losing peoples’ houses and their agricultural lands would be the major socio-economic issues. All these issues will be solved or minimized.